This is a Blog following
the 14 month redevelopment of the
church building which finished in September 2019. A few months later in March 2020 the church had to close due to the pandemic and we are waiting to hear when we will be allowed to re-open.
Thursday, 8 November 2018
November
As the clocks went back the project was on schedule with rendering work on the outside walls and roof continuing a pace.
View of the new upper floor, the light streaming in from the Tetherdown side of the building.
The Tower under construction, the walls being built around the steel frame. This will house the staircase to the upper floor.
Current view of the church showing it wrapped up to protect the structure and workers from the elements this winter whilst the roof is replaced. T ower construction in the front left of the photograph.