This is a Blog following
the 14 month redevelopment of the
church building which finished in September 2019. A few months later in March 2020 the church had to close due to the pandemic and we are waiting to hear when we will be allowed to re-open.
Monday, 3 December 2018
December
Upper floor detailing the top of lift shaft and air conditioning units top right
Upper floor showing the new velux windows installed into the roof, increasing the light into the space